Determined my brake problem and replaced the needed parts. Original estimate was deduced by $100 when they where able to shop around for the parts and found them from a supplier with a lower price for the same manufacturer parts. I had Randy look over the rest of the car and he found a U-joint out, so we replaced both u-joints while the drive shaft was out to prevent double labor cost. This also prevented me from having to make another trip to the shop. I was happy and on my way.